5 Jan 2023
Link Scenes with Navigation Hotspot
https://www.youtube.com/watch?v=YUlL_LAr--E You need to create a project or open existed project and add scenes before linking scenes with navigation hotspot: 1. Click the toggle-down button and choose "Point". 2. Drag and drop hotspot icon into the destination. 3. Click dragged
You need to create a project or open existed project and add scenes before linking scenes with navigation hotspot:

1. Click the toggle-down button and choose âPointâ.

2. Drag and drop hotspot icon into the destination.

3. Click dragged hotspot to open hotspot panel.

4. Select your destination scene (You need to add other scenes first).

5. Click âSet target viewâ and choose your initial view for the next destination. Click âSubmitâ.

*Optional: Tick âTransitioningâ to add the transition to the next destination
